Construction of new battery storage facility. Project includes steel piling works, concrete pile cap bases for the battery storage, Construction of new concrete bases for prefabricated buildings, crane operations for the installation of the battery and MV transformer units. This project also included the installation of ducting and cabling for the33kV grid connection.