Glenturas project scope included the installation of pre-con and post-con drainage as well as carrying out the ducting, cabling and fibre installation of the 19km triple circuit onshore grid connection to the newly constructed 220 kV substation.
Glenturas project scope included the installation of pre-con and post-con drainage as well as carrying out the ducting, cabling and fibre installation of the 19km triple circuit onshore grid connection to the newly constructed 220 kV substation.
CLIENT
Nexans
LOCATION
Carnoustie
DURATION
24 months