Oweninny Wind Farm

PROJECT SUMMARY

The approved design required a single circuit installed from the new Oweninny Wind Farm 110kV substation to the Existing Bellacorrick 110kV Substation. The route navigated remnant peat bog, disused rail embankments, site roads and a single road crossing. The project was successfully delivered including cable pulling works to allow the wind farm to be energized.

CLIENT

Gaeltec Utilities

LOCATION

Co. Mayo

DURATION

9 months