Naomh Padraig GAA – Training Facility

PROJECT SUMMARY

The work involved the construction of a 260m4G synthetic Astro-turf pitch complete with shock pad. The ball bounce wall was 20m long by 5m high and formed with reinforced concrete.

CLIENT

Naomh Padraig GAA

LOCATION

Muff

DURATION

1 month