Glenturas were contracted with the construction of a new EIRGRID spec 110kV AIS substation buildings and compound and the installation of 9.5km of 110kV grid connection ducting and cabling to connect the wind farm to the existing substation.
Glenturas were contracted with the construction of a new EIRGRID spec 110kV AIS substation buildings and compound and the installation of 9.5km of 110kV grid connection ducting and cabling to connect the wind farm to the existing substation.
CLIENT
H&MV
LOCATION
Barnesmore Gap, Donegal
DURATION
20 months