Meenbog Windfarm Substation & Grid Connection

PROJECT SUMMARY

Glenturas were contracted with the construction of a new EIRGRID spec 110kV AIS substation buildings and compound and the installation of 9.5km of 110kV grid connection ducting and cabling to connect the wind farm to the existing substation.

CLIENT

H&MV

LOCATION

Barnesmore Gap, Donegal

DURATION

20 months