Euston Solar Farm

PROJECT SUMMARY

Glenturas was awarded the contract for the construction of a 132kV UKPN-compliant substation and grid connection to facilitate the connection of Euston Solar Farm to the local electricity network.

The grid connection included 4.5km of direct-buried 132kV cable, featuring multiple directional drills to navigate route constraints.

The substation consisted of both customer-side and DNO (Distribution Network Operator) infrastructure, with full foundation works for all on-site equipment.

CLIENT

H&MV Engineering

LOCATION

Thetford, England

DURATION

12 Months